Maintenance schedule for wear parts of the Robot Extruder system.

This article gives insight on the day to day preventive maintenance for the robot extruder system. Including the base unit, extruder and the dryer.

Extruder

  • Preventive maintenance

    Every day

    • Inspect filters

    every month

    • Inspect hopper for wear (especially for high productivity facilities)
    • Inspect heater bands
    • Inspect thermocouples

    Every year

    • Inspect bearings for play
    • Apply new grease to the bearings
    • Inspect the tightness of electrical connections
    • Inspect the nozzle assembly.

Base unit

  • Preventive maintenance

    Every month

    • Inspect water cooling
    • Inspect transport pump
    • Inspect the pinch valve

    Every Year

    • Inspect inputs and outputs of separate components
    • Inspect the tightness of electrical connections

Dryer

A separate maintenance manual is supplied by VISMEC which is also to be found on our knowledge base.

Below is a short summary.

  • Preventive maintenance

    Every day

    • Clean the process and regeneration filters

    Every month

    • Clean the outer surfaces of the cooling elements and the inlet air slot.

    Every 3 Months

    • Check the state of all the pipes, wiring and gears inside the machine.

    Every 6 months

    • Check and if necessary replace all the machine filters
    • Check the tightness of the electric terminals.